Manhattan · Block 2006 · Lot 28 · 10030

103 West 137 Street

5 floors · 10 apartments · 9,275 sq ft · built 1910 · class C1 · owner of record: Hp Genesis Y15 Housing Development Fund Co., Inc.

12open violations
$5,000ECB/OATH penalties owed
1HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-12 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $5,000 owed
IssuedViolationHearingBalance
Aug 25, 2026Construction CLASS - 1
AT FRONT OF BUILDING, DECORATIVE STONE ABOVE 3RD FLOOR WINDOW HAS SECTION DETACHED AND FALLEN TO GRADE, MAINTAIN EXTERIOR BUILDING WALL
#39201648R
Jun 24, 2027
PENDING
$5,000
DOB (1)
IssuedViolationStatus
Aug 25, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT FRONT OF BUILDING, DECORATIVE COIN ABOVE 3RD FLOOR WINDOW HAS DETACHED AND FALLEN TO GRADE. BUILDING HAS MULTIPLE COINS AND DECORATIVE STONE FINISH.
#26-02099
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
HPD (6) · C 1 · B 4 · A 1
IssuedClassViolationCorrect by
Oct 5, 2026BApt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHNov 9, 2026
Oct 5, 2026BApt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHNov 9, 2026
Sep 9, 2026BApt 4B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTHOct 14, 2026
Sep 9, 2026BApt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTHOct 14, 2026
Sep 9, 2026AApt 4B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTHDec 13, 2026
May 16, 2022C§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORYMay 22, 2022

Issued in the last 120 days

DateSourceWhatNow
Oct 5, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Oct 5, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 9, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 9, 2026HPD B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 9, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Aug 26, 2026DOBIMMEDIATE EMERGENCY: REMEDY: INSTALL APPROXIMATELY 35 LINEAR FEET OF SIDEWALK.SHED AT EXP 1 TO SAFEGUARD THE PUBLICClosed
Aug 25, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT FRONT OF BUILDING, DECORATIVE COIN ABOVE 3RD FLOOR WINDOW HAS DETACHED AND FALLEN TO GRADE. BUILDING HAS MULTIPLE COINS AND DECORATIVE STONE FINISH.Open
Aug 25, 2026ECBConstruction: AT FRONT OF BUILDING, DECORATIVE STONE ABOVE 3RD FLOOR WINDOW HAS SECTION DETACHED AND FALLEN TO GRADE, MAINTAIN EXTERIOR BUILDING WALLOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 2:25 PM ET. BBL 1020060028.

Look up another building