Manhattan · Block 1860 · Lot 128 · 10025

103 West 105 Street

5 floors · 10 apartments · 7,826 sq ft · built 1930 · class C6 · owner of record: 103-105 West 105th Street L.P.

3open violations
$4,375ECB/OATH penalties owed
1HPD class C (immediately hazardous)
46dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1142 days
Next cycle year 2029

Open violations

ECB / OATH (2) · $4,375 owed
IssuedViolationHearingBalance
Apr 11, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED STEP CRACKS AND SPALLING STUCCO AT EXPOSURE 1 AND 4., REPAIR AND/OR REPLACE
#39184155R
Jan 21, 2027
PENDING
$1,250
Sep 5, 2023Construction CLASS - 2
OBSERVED IN BASEMENT IN THE LAUNDRY ROOM A FUTURE ON GAS LINE WHICH CONTRARY TO FGH 404.15, REPAIR AND/OR REPLACE
#39094061R
Nov 9, 2023
DEFAULT
$3,125
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (1) · C 1 · B 0 · A 0
IssuedClassViolationCorrect by
Oct 24, 2022CApt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EASTNov 19, 2022

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 10:21 PM ET. BBL 1018600128.

Look up another building