Manhattan · Block 205 · Lot 7501 · 10013

103 Mott Street

7 floors · 33,031 sq ft · built 1920 · class RC · owner of record: Kimbo Dynasty Realty Inc

128open violations
$2,850ECB/OATH penalties owed
0HPD class C (immediately hazardous)
66dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-09-01 (Accepted). Agency page

Dec 31, 2026
in 66 days
2 of 2 without an accepted 2026 report yet
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $45,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 118 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 33,031 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1162 days
Next cycle year 2029

Open violations

ECB / OATH (8) · $2,850 owed
IssuedViolationHearingBalance
Mar 12, 2018Construction CLASS - 1
WORK W/O PERMIT.WORK NOTED:AT TIME OF INSPECTION I OBSERVED THE REMOVE& CAPPING OF PLUMBING FIXTURES THROUGHOUT CELLAR LEVEL.THIS INCLUDES DRAIN,WASTE,VENT & COPPER WATER LINES IN EXISTING BATHRMS.JOB APP#12321
#35306110K
Jun 28, 2018
IN VIOLATION
$1,250
Mar 12, 2018Unknown CLASS - 1
ELECTRICAL WORK W/O PERMIT.WORK NOTED:AT TIME OF INSPECTION I OBSERVED AT THROUGHOUTH 1ST FL&CELLAR LEVEL,DEMO WORK IN PROGRESS REMOVING ELECTRICAL WIRING FOR LIGHTING,POWER& SWITCHES.NO DOB PERMITS FILED FOR T
#35306111M
Jun 28, 2018
IN VIOLATION
$1,600
Jun 20, 2017Local Law CLASS - 2
FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000004972 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER,1,2016.REM:FILE ANNUAL CERT
#37003082R
Dec 7, 2017
WRITTEN OFF
$0
Jun 20, 2017Local Law CLASS - 2
FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000004962 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER,1,2016.REM:FILE ANNUAL CERT
#37003081P
Dec 7, 2017
WRITTEN OFF
$0
Aug 5, 2009Construction CLASS - 2
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C/O AS PER 28-118.3.1-28-118.3.2. NOTED: THE FOLLOWING CONDITIONS: FINAL C/O #96798 DATED 8.20.90 INDICATES 3RD FLR AS MANUFACTURING. EXISTING CONDITIONS ARE OFFICES &
#34799368J
Sep 24, 2009
STIPULATION/IN-VIO
$0
Jul 15, 2003Boilers Non-Hazardous
50A,50B,50C,48AB. 50A)WATER COLUMN NOT ALIGNED WITH VERTICAL BOILER. 50B)SECONDARY BLOW DOWN VALVE NOT SLOW-CLOSING TYPE. 50C)NO DISCHARGE PIPE ON THE SAFETY VALVE
#32041596J
Jul 29, 2004
WRITTEN OFF
$0
Dec 29, 1997Boilers Non-Hazardous
49-BOILER CANT BE INSPECTED ON LEFT SIDE, DUE TO BOILER ROOM WALL TOO CLOSE TO BOILER.
#32015293N
Feb 19, 1998
WRITTEN OFF
$0
Apr 12, 1996Boilers Non-Hazardous
3A CORRODED SECTION OF FLUE PIPE IN THE WINDOW BE REPLACED BY NEW ONE ALONG WITH T CONNECTION OUTSIDE.
#32013953K
Jul 18, 1996
WRITTEN OFF
$0
DOB (54)
IssuedViolationStatus
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
#00191
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#00993
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
#00192
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
#00193
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#00991
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#00992
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#05109
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01061
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#04967
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01063
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01062
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
#00219
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
#00218
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
#00203
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#26606
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#06663
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#03728
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#03727
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
#02596
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
#02595
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
#01348
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
#00202
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
#01347
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#03389
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00191
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00995
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
#01403
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#02650
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
#03790
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#06518
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#28001
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00031
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#03610
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
#01181
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00135
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
#00037
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
#00043
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
#00042
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
#00038
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#00900
DOB VIOLATION - ACTIVE
Jun 22, 2018HIGH PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
#00016
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#00104
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#00999
DOB VIOLATION - ACTIVE
Dec 16, 2016HIGH PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
#00015
DOB VIOLATION - ACTIVE
Dec 16, 2016HIGH PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
#00049
DOB VIOLATION - ACTIVE
Dec 16, 2016HIGH PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
#00007
DOB VIOLATION - ACTIVE
Mar 1, 2013LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
#03266
DOB VIOLATION - ACTIVE
Jan 31, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
#00719
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#04717
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#05571
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#01520
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#01549
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#01558
DOB VIOLATION - ACTIVE
Aug 8, 2002LOCAL LAW 11/98 - FACADE

#NRF50144
DOB VIOLATION - ACTIVE
DOB NOW Safety (68)
IssuedViolationStatus
Sep 4, 2026GHG Emissions - LL97 FTX-EN-LL97320
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2023Boiler FTC-BE-INT-HP
Violation Issued-Failure To File 2019 Internal Inspection Affirmation of Correction for HP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Jun 22, 2018Boiler HBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Dec 16, 2016Boiler HBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
Active
Dec 16, 2016Boiler HBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
Active
Dec 16, 2016Boiler HBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 1, 2013Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Active
Jan 31, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 31, 2009Boiler LBLVIO
Active
Jan 1, 2009Boiler LL6291
Active
Jan 3, 2008Boiler LL6291
Active
Jan 19, 2007Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active

Showing 60 of 68. Full list on the agency site.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 4, 2026DOB SafetyGHG Emissions - LL97: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 5:52 AM ET. BBL 1002057501.