1 floors · 2,830 sq ft · built 1931 · class K1 · owner of record: 103-01 Thru 103-17 Roosevelt Ave Real Es T Holding
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 25, 2025 | Construction CLASS - 1 FAILURE TO COMPLY AND CERTIFY CORRECTIONS FOR VIOLATION 39122699L, COMPLY WITH COMMISSIONER'S ORDER #39168263Y | Feb 3, 2026 DEFAULT | $12,500 |
| Aug 21, 2024 | Construction CLASS - 1 WORK W/O PERMIT-AT TIME OF INSPECTION OBSERVED PLEXIGLASS AND METAL STRUCTURES (FLOWERS& JUGOS NATURALS) AT 103-07 ALONG WITH (JUGOS NATURALS) AT 103-15,WITH NO STRUCTURAL STABILITY ATTESTED FOR WITH ELECTRICAL #39122699L | May 12, 2025 DEFAULT | $12,500 |
| Jun 24, 2022 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO#35144814J ISSUED ON 3/21/16 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. WORK W/O A PERMIT,AT GROUND LEVE #35567082H | Jan 17, 2023 ADMIT/IN-VIO | $0 |
| Mar 21, 2016 | Construction CLASS - 2 WORK W/O A PERMIT. WORK NOTED: AT GROUND LEVEL,STORE FRONT PROPERTY SUB DIVIDED INTO 2 SEPARATE UNIT W/ELECTRICAL LINE FOR LIGHT FIXTURES & OUTLETS. OUTSIDE ABOVE GROUND AWNING ALSO ALTERATED FROM 1 UNIT INTO 2 #35144814J | Sep 13, 2016 WRITTEN OFF | $0 |
| Mar 29, 2013 | Construction CLASS - 2 WORK W/O PERMIT.NOTED:ERECTED A BUSINESS ACCESSORY SIGN FOR"GROCERY" APPROX 20' X 4'. REMEDY:OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION. #35012255H | Jun 25, 2013 WRITTEN OFF | $0 |
| Mar 18, 2006 | Quality of Life Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG. DEPT. RECORDS- ILLEGAL OCCUPANCY NOTED: LEGAL STORE HAS BEEN CONVERTED INTO 3 STORES AT THE 1ST FL. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY FORTHWITH. #34505296N | Dec 19, 2006 WRITTEN OFF | $0 |
| Nov 29, 2005 | Quality of Life Hazardous OCCUPANCY CONTRARY TO D.O.B RECORDS WHICH INDICATE LEGAL OCCUPANCY BY 1 STORE ON 1ST FLOOR, CONTRARY TO DOB RECORDS FIRST FLOOR NOW OCCUPIEDBY 3 STORES WITH SAME ADDRESS. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY O #34502263N | Jan 17, 2006 WRITTEN OFF | $0 |
| Aug 3, 2005 | Construction Hazardous ALTERED BUILDING (# ALT 1 40149807Z) OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY.V.G.6 STOREFRONTS SUBDIVIDED INTO SMALLER RETAIL UNITS WITH STREET VENDOR OPERATING FROM KIOSK ALCOVES IN FRONT.REMEDY: OBT #34488646M | Sep 20, 2005 IN VIOLATION | $0 |
| Jul 20, 2005 | Construction Hazardous WORK DOES NOT CONFORM TO APPROVE PLANS. WORK NOTED: FROM 2) STORES CONVERTED TO 3) STORES. REMEDY: CONFORM TO APPROVED PLANS. #34491410N | Oct 11, 2005 IN VIOLATION | $0 |
| Jul 20, 2005 | Construction Hazardous ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. ALT TYPE 1 JOB #401498072 TO CONVERT (1) STORE INTO (2) NOW OCCUPIED AS (3) STORES. JOB WAS NOT SIGNED OFF AT TIME OF INSPECTION. REMEDY: OBTA #34491409X | Oct 11, 2005 IN VIOLATION | $0 |
| Jul 20, 2005 | Quality of Life Hazardous OCCUPANCY CONTRARY TO DEPT OF BLDGS RECORDS D.O.B. RECORDS INDICATE PREMISES TO BE A 1 STORE CELLAR BOILEROOM. ILLEGAL OCCUPANCY NOTED: ON FIRST FLOOR/GROUND LEVEL CREATE 3 STORES WITH SAME ADDRESS WITH NO PERM #34488387R | Sep 13, 2005 IN VIOLATION | $0 |
| Mar 28, 2003 | Signs Non-Hazardous HAVING INSTALLED AN AWNING W/O A PERMIT REMEDY:REMOVE ILLEGAL WORK #34380839Y | Jul 17, 2003 WRITTEN OFF | $0 |
| Mar 28, 2003 | Signs Non-Hazardous HAVING SIGNAGE WITH A SURFACE AREA GREATER THAN 3 TIMES THE STREET FRONTAGE OF THE ZONING LOT (OR MORE THAN 150 SQ FT) REMEDY:REMOVE ILLEGAL SIGNAGE #34380841N | Jul 17, 2003 WRITTEN OFF | $0 |
| Mar 28, 2003 | Signs Non-Hazardous HAVING AWNING SIGNAGE WITH A SURFACE AREA EXCEEDING 12 SQ FT WITH LETTERS HIGHER THAN 12 IN NOT LIMITED TO THE NAME AND ADDRESS OF THE ESTABLISHMENT.REMEDY:REMOVE ILLEGAL SIGNAGE #34380840L | Jul 17, 2003 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 17, 2011 | CONSTRUCTION #0304TB | DOB VIOLATION - ACTIVE |
| Mar 14, 2011 | CONSTRUCTION #0301SA | DOB VIOLATION - ACTIVE |
| Nov 24, 2010 | CONSTRUCTION #0403XZ | DOB VIOLATION - ACTIVE |
| Nov 24, 2010 | CONSTRUCTION #0402XZ | DOB VIOLATION - ACTIVE |
| May 6, 2010 | CONSTRUCTION #ER01DG | DOB VIOLATION - ACTIVE |
| Dec 26, 2002 | CONSTRUCTION #0301HK | DOB VIOLATION - ACTIVE |
| Apr 2, 2002 | CONSTRUCTION #ZSTF05EC | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 2, 2002 | CONSTRUCTION #ZSTF04EC | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 2, 2002 | CONSTRUCTION #STF05EC | DOB VIOLATION - ACTIVE |
| Apr 2, 2002 | CONSTRUCTION #STF04EC | DOB VIOLATION - ACTIVE |
| Nov 23, 1998 | CONSTRUCTION #C03MAD05 | VIOLATION UNSERVED ECB-ACTIVE |
| Mar 6, 1996 | CONSTRUCTION #03Y05 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 6:49 AM ET. BBL 4017700096.