2 floors · 1 apartments · 2,358 sq ft · built 1910 · class K4 · owner of record: 5 Coleman Square Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#35719402H., COMPLY WITH COMMISSIONER'S ORDER #39205065N | Dec 1, 2026 PENDING | $2,500 |
| Sep 22, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35719347Y., FILE A CERTIFICATE OF CORRECTION #39205048L | Dec 1, 2026 PENDING | $1,250 |
| Sep 22, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS#35719401X., FILE A CERTIFICATE OF CORRECTION #39205050K | Dec 1, 2026 PENDING | $1,250 |
| Sep 22, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35720350N., FILE A CERTIFICATE OF CORRECTION #39205047J | Dec 1, 2026 PENDING | $1,250 |
| Sep 22, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#35719404L., COMPLY WITH COMMISSIONER'S ORDER #39205064L | Dec 1, 2026 PENDING | $2,500 |
| Sep 22, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35719348X., FILE A CERTIFICATE OF CORRECTION #39205045X | Dec 1, 2026 PENDING | $1,250 |
| Sep 22, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#35719403J., COMPLY WITH COMMISSIONER'S ORDER #39205066P | Dec 1, 2026 PENDING | $2,500 |
| Sep 22, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35719407R., FILE A CERTIFICATE OF CORRECTION #39205049N | Dec 1, 2026 PENDING | $1,250 |
| Sep 22, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35719400Y., FILE A CERTIFICATE OF CORRECTION #39205051M | Dec 1, 2026 PENDING | $1,250 |
| Aug 10, 2026 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED: AT THE TIME OF INSPECTION THE WRITTEN POSTED ACTIVE VACATE ORDER #Q343/2025 ISSUED ON 09/06/2025 HAS BEEN REMOVED FROM THE FRONT ENTRY DOOR. ALSO VACATE #35729196P | May 25, 2027 PENDING | $12,500 |
| Nov 21, 2025 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED AT TIME OF INSPECTION A WRITTEN POSTED ACTIVE VACATE ORDER #Q343/2025 ISSUED ON 09/16/2025 AND POSTED ON 09/18/2025 HAS BEEN REMOVED FROM THE FRONT ENTRY #35720350N | Jan 27, 2026 DEFAULT | $25,000 |
| Sep 16, 2025 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT. OF BUILDINGS RECORDS. ILLEGAL OCCUPANCY NOTED: AT 1ST FLOOR HAS BEEN USED/CONVERTED AS TRANSIENTLY SLEEPING ACCOMODATION WITH 24 CUBICLES/PODS, 3 BATHROOMS WITH S #35719347Y | Jun 2, 2026 IN VIOLATION | $2,500 |
| Sep 16, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF A SYSTEM OF AUTOMATIC SPRINKLERS WHERE IS REQUIRED PER BC 903.2 AND 27-954, FOR SLEEPING ACCOMODATION AT 1ST FLOOR WITH TRANSIENT 244 CUBICLES/PODS #35719400Y | Jun 2, 2026 IN VIOLATION | $2,500 |
| Sep 16, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE REQUIRED NATURAL LIGHTS AND VENTILATION FOR EVERY BEDROOMS. NOTED:AT 1ST FLOOR HAVING CREATED 24 SLEEPING CUBICLES/PODS WITHOUT REQUIRED #35719348X | Jun 2, 2026 IN VIOLATION | $2,500 |
| Sep 16, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. WORK NOTED: AT 1ST FLOOR INSTALLED WATER AND WASTE LINES FOR 3 BATHROOMS WITH TOTAL 4 SINKS, 3 TOILETS AND 4 SHOWERS;WASHING MACHINE, HOT WATER BOILER AND KITCHEN SINK AT REAR ROOM(SRO UN #35719403J | Dec 4, 2026 PENDING | $2,500 |
| Sep 16, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. WORK NOTED: AT 1ST FLOOR ERECTED FULL HEIGHT PARTITION WALLS TO CREATE ROOM WITH 24 CUBICLES/PODS AND 3 BATHROOM; AT REAR CREATED EXTENSION APPROX. 10' BY 12' OCCUPIED AS SRO UNIT. REMEDY #35719402H | Dec 4, 2026 PENDING | $2,500 |
| Sep 16, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. WORK NOTED: AT 1ST FLOOR INSTALLED ELECTRICAL LINES FOR LIGHTS, SWITCHES, OUTLETS AND 220V FOR ELECTRICLE DRYER; INSTALLED SPLIT UNITS AT REAR. REMEDY: OBTAIN REQUIRED PERMIT. #35719404L | Dec 4, 2026 PENDING | $2,500 |
| Sep 16, 2025 | Construction CLASS - 1 BC 907.2.8. FAILURE TO PROVIDE FIRE ALARM SYSTEM CLASS "J" FOR TRANSIENT SLEEPING ACCOMODATION AT 1ST FLOOR WITH 244 CUBICLES/PODS AND SRO UNIT AT REAR. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY. #35719401X | Jun 2, 2026 IN VIOLATION | $2,500 |
| Sep 16, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1(2014 CODE); 27-371; BC 1008.1.9(2014 CODE); BC 1010.1.8.(2022 CODE); BC 1010.1.9(2022 CODE). NOTED: AT #35719407R | Jun 2, 2026 IN VIOLATION | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#35719402H., COMPLY WITH COMMISSIONER'S ORDER | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35719347Y., FILE A CERTIFICATE OF CORRECTION | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS#35719401X., FILE A CERTIFICATE OF CORRECTION | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35720350N., FILE A CERTIFICATE OF CORRECTION | Open |
| Sep 22, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#35719404L., COMPLY WITH COMMISSIONER'S ORDER | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35719348X., FILE A CERTIFICATE OF CORRECTION | Open |
| Sep 22, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#35719403J., COMPLY WITH COMMISSIONER'S ORDER | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35719407R., FILE A CERTIFICATE OF CORRECTION | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35719400Y., FILE A CERTIFICATE OF CORRECTION | Open |
| Aug 10, 2026 | ECB | Construction: REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED: AT THE TIME OF INSPECTION THE WRITTEN POSTED ACTIVE VACATE ORDER #Q343/2025 ISSUED ON 09/06/2025 HAS BEEN REMOVED FROM THE FRONT ENTRY DOOR. ALSO VACATE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 4:33 PM ET. BBL 4141820194.