10 floors · 251,467 sq ft · built 1981 · class H3 · owner of record: Asap Ditmars Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (7 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-03-11 (Accepted). Agency page | Dec 31, 2026 in 66 days | 7 of 7 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 251,467 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $90,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 849 days | Filing window not open yet |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1641). Agency page | Dec 31, 2031 in 1892 days | Next due 2031 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 25, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911952 | DOB VIOLATION - ACTIVE |
| Jun 11, 2024 | CONSTRUCTION FAILURE TO MAINTAIN FACADE AND APPURTENANCES.OBSERVED LAMINATING,SPALL ING STUCCO AT EXP2 SOUTH ELEV.REMEDY:OWNER TO IMMEDIATELY RETAIN A NYC REG DESIGN PROFESSIONAL WITH QEWI CERTIFICATION AND EXPERIENCE IN STUC CO TO INSPECT AND EVALUATE 100% OF THE STUCCO FACADE AND ALL DECORATIV E STONES ON ALL #FA0301AB | DOB VIOLATION - ACTIVE |
| Jun 11, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO DELAMINATING STUCCO AT EXP2 SOUTH ELEV AT THE PARAPET LEVEL.REMEDY:OWNER IS TO IMMEDIATELY PROVIDE A PLOT PLAN W ITH DIMENSION NOTING THE AREA TO BE CLOSED OFF,NO WORKS SHOULD BE NEAR THE DEFECTED FACADE.RETAIN A NYS REG PROFESSIONAL TO DIRECT AND SUPERV ISE ALL WORKS AND #FA0302AB | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #03750 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 25, 2024 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)