Queens · Block 1697 · Lot 43 · 11368

102-03 Northern Boulevard

2 floors · 2 apartments · 3,040 sq ft · built 1930 · class S9 · owner of record: Gladys Ramirez

6open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
801dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 801 days
Next cycle year 2028

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Dec 1, 2008Construction CLASS - 1
WORK W/O A PERMIT. AT CELLAR LEVEL UNDERPINNING WORK DONE ON ADJOININGBLDG ON THE NORTH AND SOUTH FOUNDATION WALLS APPRX 3'-6" CELLAR FLR HAVE BEEN REMOVED AND ADDITIONAL STEPS WERE INSTALLED NO APPLICATION FOU
#34750644J
May 5, 2009
DEFAULT
$0
Dec 1, 2008Construction CLASS - 3
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION PLANS/DOCUMENTS FOR ALTII JOB 3410014862 EXP 12/28/07. CONTRARY 31 PLAN DOESN NOT SHOW AT FIRST FLOOR (A) SINK BESIDE DISH WASHER, (B) OPENIGN IN WALL APPROX 4'-6'
#34750920R
Jan 20, 2009
STIPULATION/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Nov 12, 2006CONSTRUCTION

#ER01MR
DOB VIOLATION - ACTIVE
Apr 3, 1995CONSTRUCTION

#404PR15
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
HPD (1) · C 1 · B 0 · A 0
IssuedClassViolationCorrect by
Aug 21, 2008CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM KITCHEN 2ND STY. APT. 1R.Aug 27, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 10:31 AM ET. BBL 4016970043.

Look up another building