2 floors · 4 apartments · 3,318 sq ft · built 1930 · class C3 · owner of record: Pinn, Gregory
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 20, 2026 | C | Apt 11STFL · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRING AT OUTLET AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 26, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 15, 2026 |
| Jul 20, 2026 | B | Apt 11STFL · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 24, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | B | Apt 11STFL · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 24, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Aug 13, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN TH | Aug 13, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, SOUTH WALL, | Aug 13, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Aug 13, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 15, 2026 |
| Jul 20, 2026 | B | Apt 11STFL · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 24, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st RO | Aug 13, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | B | Apt 11STFL · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 24, 2026 |
| Jul 20, 2026 | A | Apt 11STFL · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 23, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, NORTH WALL, EAST WALL, 1st WINDOW FRAME FROM W | Aug 13, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, SOUTH WALL, EAST WALL IN THE 5th ROOM FROM EAS | Aug 13, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORT | Aug 13, 2026 |
| Jul 20, 2026 | C | Apt 11STFL · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Aug 13, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 20, 2026 | HPD C | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRING AT OUTLET AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Jul 20, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN TH | Open |
| Jul 20, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, SOUTH WALL, | Open |
| Jul 20, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Jul 20, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st RO | Open |
| Jul 20, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 11STFL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 3:31 PM ET. BBL 2027560047.