Brooklyn · Block 1484 · Lot 41 · 11221

1013 Putnam Avenue

4 floors · 8 apartments · 9,359 sq ft · built 2012 · class C1 · owner of record: Madison/Putnam Hsg Devlpmt Fd Co

9open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
60dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-19 (Accepted). Agency page

Dec 31, 2026
in 60 days
2 of 2 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 304 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 791 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (5)
IssuedViolationStatus
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#14352
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#16385
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#36533
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#24451
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#37843
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
HPD (3) · C 2 · B 1 · A 0
IssuedClassViolationCorrect by
Oct 28, 2026CApt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE UPPER WINDOW SASH IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHNov 3, 2026
Aug 10, 2026BApt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 1ST LOWER SASH SPRING BALANCE WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHSep 14, 2026
May 23, 2025CApt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTERBALANCE AT LOWER SASH AT 1ST WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4A LOWER LEVEL, 4th STORYMay 29, 2025

Issued in the last 120 days

DateSourceWhatNow
Oct 28, 2026HPD C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE UPPER WINDOW SASH IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Aug 10, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 1ST LOWER SASH SPRING BALANCE WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Aug 10, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET DOOR AT NORTH WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHClosed
Aug 10, 2026HPD A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN CERAMIC REGLAZE FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 4A UPPER LEVEL, 4th STORY, 1st APARTMENT FROM WEST AT NORTHClosed
Aug 10, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN CERAMIC REGLAZE FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 4A LOWER LEVEL, 4th STORY, 1st APARTMENT FROM WEST AT NORTHClosed
Aug 10, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION UNIT AT EAST WALL IN THE BATHROOM LOCATED AT APT 4A UPPER LEVEL, 4th STORY, 1st APARTMENT FROM WEST AT NORTHClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 12:18 AM ET. BBL 3014840041.

Look up another building