7 floors · 30 apartments · 25,664 sq ft · built 2021 · class D1 · owner of record: 101 Macombs Place Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 25,664 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 314 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 487 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 27, 2021 | Construction CLASS - 1 WORK DOES NOT CONFORM TO CONSTRUCTION DOCUMENTS &/OR AMENDMENTS. AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD IN PLACE. AT EXP#1 OBSERVED U-JACKS INSTALLED TO SUPPORT THE LOAD OF THE SUPPORTED PIPE SCAFFOL #35504396M | Mar 24, 2022 IN VIOLATION | $312 |
| Sep 3, 2021 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.AT THE TIME OF INSPECTION OF A NEW BLDG CURRENTLY ON 7FL LEVEL W/DESIGNATED COMPETETENT PERSON BY NAME ON JOEL LANDAU PERSON ON SITE.I NOTED A 7SW #35508821M | Sep 22, 2022 IN VIOLATION | $5,000 |
| Aug 18, 2017 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO # 35244350Z ISSUED ON 04/19/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. DRAINS CLOGGED & SEVERE ACCUMULATION OF WATER BLDG #35287424M | Sep 6, 2018 DEFAULT | $2,000 |
| Aug 18, 2017 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES @ FRONT WALL,FACING MACOMBS PLACE,SEVERAL AREAS ARE FALLING APART. MASONRY IS BLDG CRACKING & DETERIORATING FROM WATER & EROSION. REMEDY: MAINTAIN EXTERIOR BLDG #35287422Z | Sep 6, 2018 DEFAULT | $2,500 |
| Aug 18, 2017 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. THIS BLDG IS IN NEED OF DESPERATE REPAIR. THE AWNING FRAME IS ABOUT TO FALL OFF. THE BRICK STEPS & SIDEWALKS ARE CRACKED & DETERIORATING & VERY UNEVEN COUSING #35287423K | Sep 6, 2018 DEFAULT | $2,500 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 5:28 AM ET. BBL 1020400023.