Manhattan · Block 2040 · Lot 23 · 10039

101 Macombs Place

7 floors · 30 apartments · 25,664 sq ft · built 2021 · class D1 · owner of record: 101 Macombs Place Llc

0open violations
$12,312ECB/OATH penalties owed
0HPD class C (immediately hazardous)
70dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 25,664 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 487 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 801 days
Next cycle year 2028

Open violations

ECB / OATH (5) · $12,312 owed
IssuedViolationHearingBalance
Dec 27, 2021Construction CLASS - 1
WORK DOES NOT CONFORM TO CONSTRUCTION DOCUMENTS &/OR AMENDMENTS. AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD IN PLACE. AT EXP#1 OBSERVED U-JACKS INSTALLED TO SUPPORT THE LOAD OF THE SUPPORTED PIPE SCAFFOL
#35504396M
Mar 24, 2022
IN VIOLATION
$312
Sep 3, 2021Construction CLASS - 1
UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.AT THE TIME OF INSPECTION OF A NEW BLDG CURRENTLY ON 7FL LEVEL W/DESIGNATED COMPETETENT PERSON BY NAME ON JOEL LANDAU PERSON ON SITE.I NOTED A 7SW
#35508821M
Sep 22, 2022
IN VIOLATION
$5,000
Aug 18, 2017Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO # 35244350Z ISSUED ON 04/19/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. DRAINS CLOGGED & SEVERE ACCUMULATION OF WATER BLDG
#35287424M
Sep 6, 2018
DEFAULT
$2,000
Aug 18, 2017Construction CLASS - 1
FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES @ FRONT WALL,FACING MACOMBS PLACE,SEVERAL AREAS ARE FALLING APART. MASONRY IS BLDG CRACKING & DETERIORATING FROM WATER & EROSION. REMEDY: MAINTAIN EXTERIOR BLDG
#35287422Z
Sep 6, 2018
DEFAULT
$2,500
Aug 18, 2017Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. THIS BLDG IS IN NEED OF DESPERATE REPAIR. THE AWNING FRAME IS ABOUT TO FALL OFF. THE BRICK STEPS & SIDEWALKS ARE CRACKED & DETERIORATING & VERY UNEVEN COUSING
#35287423K
Sep 6, 2018
DEFAULT
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 5:28 AM ET. BBL 1020400023.