Manhattan · Block 128 · Lot 2 · 10007

101 Barclay Street

26 floors · 1,133,549 sq ft · built 1983 · class O4 · owner of record: The Bank Of New York Mellon

10open violations
$12,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
179dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 1,133,549 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 179 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 179 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $105,750 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 475 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 789 days
Next cycle year 2028
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 128). Agency page

Dec 31, 2028
in 789 days
Next due 2028

Open violations

ECB / OATH (4) · $12,500 owed
IssuedViolationHearingBalance
Apr 3, 2026Unknown CLASS - 1
AT TIME OF INSPECTION, OBSERVED FAILURE TO COMPLETE REQUIRED INCIDENT REPORTING FOR INJURY ON 03/26/2026 (WORKER STRUCK BY MINI DUMPSTER), IN THAT REQUIRED 16-QUESTIONNAIRE WAS NOT SUBMITTED WITHIN 3 BUSINESS D
#39552594P
May 10, 2027
DEFAULT
$12,500
Jan 3, 2018Zoning CLASS - 2
VIOLATION OF DISCRETIONARY ZONING CONDITIONS ON PRIVATELY OWNED PUBLICSPACE.FAILURE TO COMPLY WITH A CPC SPECIAL PERMIT C800477 ZSM AND PLAN800477 ZSM,DATED SEPT.18,1980 INDICATES THAT THE "L" SHAPED PUBLIC LOB
#35311230L
Apr 12, 2018
IN VIOLATION
$0
Aug 22, 2017Zoning CLASS - 2
SEC. 37-727 VIOLATION OF DISCRETIONARY ZONING CONDITIONS ON PRIVATELY OWNED PUBLIC SPACE. FAILURE TO COMPLY W/A CPS SPECIAL PERMIT C 800477 ZSM & PLAN 800477 ZSM,DATED 9-18-80 24HRS. NOTED: AT TIME OF INSPECTIO
#35272195X
Apr 12, 2018
IN VIOLATION
$0
May 12, 2017Zoning CLASS - 2
VIOLATION OF DISCRETIONARY ZONING CONDITIONS ON PRIVATELY OWNED PUBLICSPACE.NOTE:SPECIAL PERMIT C 800477ZSM AND PLAN C800475HUM DATED NOVEMBER 1979 INDICATES THAT THE "L" SHAPED PUBLIC LOBBY IS OPEN TO THE PUBL
#35260118Y
Apr 12, 2018
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Apr 14, 2004ELEVATOR

#9444/198291
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Nov 25, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A compliance report by 12/31/2023
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 3:35 PM ET. BBL 1001280002.

Look up another building