3 floors · 4 apartments · 7,400 sq ft · built 1931 · class S4 · owner of record: Ecuo Real Holdings Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 18, 2023 | Boilers CLASS - 2 LIGHTS IN BOILER ROOM NOT WRKING, HARFORD LOOP ROTTED, FLUE PIPE NOT SEALED TO CHIMNEY CLEANOUT MISSING ON CHIMNEY BASE CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION #39086602K | Jul 25, 2023 DEFAULT | $3,125 |
| May 18, 2023 | Boilers CLASS - 2 AS PER CLASS2(B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS SUBMIT A CURRENT BO-9 REPORT #39086601Z | Jul 25, 2023 DEFAULT | $3,125 |
| Mar 6, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE - COMPLAINT MANNER IN CELLAR LACK SUPPORT ON GAS LINE BUSHING ON GAS LINE ALSO HAVING FUTURE ON GAS PIPE, REPAIR AND/REPLACE #39019098K | Dec 29, 2020 DEFAULT | $6,250 |
| Feb 20, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35393454M ISSUED ON 12-27-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. AT FRONT INSTALLED THE SIDEWALK SHED. REMEDY: COMPLY W/COMM'S #35394691K | Apr 30, 2019 DEFAULT | $6,250 |
| Dec 27, 2018 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# 35346829H ISSUED ON 7/21/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. INSTALLED APPROX. 40 LI #35393454M | Mar 5, 2019 DEFAULT | $12,500 |
| Oct 30, 2018 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35346829H ISSUED ON 07/21/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT. #35396004Z | Jul 11, 2019 IN VIOLATION | $0 |
| Jul 21, 2018 | Construction CLASS - 1 WORK W/O A PERMIT. NOTED: INSTALLED APPROX 40' LINEAR FEET OF SIDEWALK SHED. NO PERMIT ON FILE FOR THIS SHED. REMEDY: OBTAIN PERMIT. #35346829H | Feb 4, 2020 IN VIOLATION | $0 |
| Jul 21, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35334465H ISSUED ON 06/07/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUIL #35341123N | Sep 4, 2018 DEFAULT | $3,125 |
| Jun 7, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES. NOTE: @ INSP EXP#1 PARAPET @ 3RD STORY BLDG IN DISREPAIR W/ SEVERAL CRACKS ALONG STUCCO FACADE VERTICAL & HORIZONTAL. REM: MAINTAIN EXTERIOR BLDG WALL. #35334465H | Aug 28, 2018 DEFAULT | $12,500 |
| Feb 25, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES. NOTED: PARAPET AT 3 STORY BUILDING IN DISREPAIR; SEVERAL CRACKS AT STUCCO. VERTICAL AND HORIZONTAL CRACKS. RMDY: REPAIR OR REPLACE. #35311621Z | Sep 18, 2018 DEFAULT | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #17835 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #16430 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #12556 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #32939 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #33432 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #12019 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #21127 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #06399 | DOB VIOLATION - ACTIVE |
| Sep 5, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00486 | DOB VIOLATION - ACTIVE |
| Apr 4, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00391 | DOB VIOLATION - ACTIVE |
| Jan 10, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00543 | DOB VIOLATION - ACTIVE |
| Sep 6, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00498 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 5, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 4, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 10, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 6, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 11, 2023 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE SCUTTLE LADDER AT PUBLIC HALL, 2nd STORY | Jan 15, 2024 |
| Dec 11, 2023 | B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL, BASEBOARD HEATER AT PUBLIC HALL, 3rd STORY, SECTION ''101-17'' | Jan 15, 2024 |
| Dec 11, 2023 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE SCUTTLE LADDER AT PUBLIC HALL, 3rd STORY, SECTION ''101-17'' | Jan 15, 2024 |
| Aug 28, 2023 | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. MAKE STATIONARY THE IRON LADDER LEADING TO SCUTTLE OPENING IN ROOF AT 3RD STORY AT PUBLIC HALL | Oct 2, 2023 |
| Jun 15, 2023 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE SCUTTLE LADDER AT PUBLIC HALL, 3rd STORY, SECTION ''110-17'' | Jul 20, 2023 |
| Jul 18, 2017 | B | Apt 3RD · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3RD, 3rd STORY | Aug 22, 2017 |
| Jul 18, 2017 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE LOCKING DEVICE AT DOOR TO BUILDING | Aug 22, 2017 |
| Jul 18, 2017 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Oct 21, 2017 |
| Jul 18, 2017 | A | § 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR ALL STORIES AT PUBLIC HALL | Oct 21, 2017 |
| Jul 18, 2017 | B | Apt 3RD · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3RD, 3rd STORY | Aug 22, 2017 |
| Jul 18, 2017 | B | Apt 3RD · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3RD, 3rd STORY | Aug 22, 2017 |
| Jul 18, 2017 | B | Apt 3RD · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 3RD, 3rd STORY | Aug 22, 2017 |
| Jul 18, 2017 | B | Apt 3RD · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 3RD, 3rd STORY | Aug 22, 2017 |
| Jul 18, 2017 | B | Apt 3RD · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 3RD, 3rd STORY | Aug 22, 2017 |
| Jul 18, 2017 | B | Apt 3RD · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3RD, 3rd STORY | Aug 22, 2017 |
| Jul 18, 2017 | B | Apt 3RD · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3RD, 3rd STORY | Aug 22, 2017 |
| Mar 15, 2016 | B | Apt 2FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 19, 2016 |
| Mar 15, 2016 | B | Apt 2FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 19, 2016 |
| Mar 15, 2016 | B | Apt 2FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 19, 2016 |
| Aug 31, 2015 | B | Apt 2 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Oct 5, 2015 |
| Aug 31, 2015 | B | SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR AT PUBLIC HALL, 2nd STORY | Oct 5, 2015 |
| Jul 30, 2009 | B | Apt 2 · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW FRAME IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY | Sep 3, 2009 |
| Jul 30, 2009 | B | Apt 2 · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW FRAME IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY | Sep 3, 2009 |
| Jul 30, 2009 | B | Apt 2 · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEAL WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY | Sep 3, 2009 |
| Jul 30, 2009 | B | Apt 2 · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEAL WATER LEAK AT CEILING IN THE ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY | Sep 3, 2009 |
| Jul 30, 2009 | B | Apt 2 · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEAL WATER LEAK AT CEILING IN THE ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY | Sep 3, 2009 |
| Jul 30, 2009 | B | Apt 2 · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILINGS ALL ROOMS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Sep 3, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 8:04 PM ET. BBL 4091810039.