class V0 · owner of record: Torat Chaim Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 15, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION OF A 3-STORY NEW BUILDING IN EXCAVATION/FOUNDATION EXCEEDING 6 FEET IN DEPTH WITHOUT A SAFE MEANS OF INGRESS AND EGRESS. THIS CONDITION IS NOT IN COMPLIANCE WITH BC 3304.7 ACCESS EXCAV #39559173Z | Nov 25, 2026 PENDING | $2,500 |
| Sep 15, 2026 | Unknown CLASS - 1 AT THE TIME OF INSPECTION OF A 3-STORY NEW BUILDING IN THE EXCAVATION/FOUNDATION PHASE, I OBSERVED AN EXCAVATOR OPERATING AT EXPOSURE #3 WHERE THE SIDES OF THE EXCAVATION LACKED PROPER SLOPING OR PROTECTION. TH #39559171P | Nov 25, 2026 PENDING | $5,000 |
| Sep 15, 2026 | Unknown CLASS - 1 AT THE TIME OF INSPECTION OF A PROPOSED 3 STORY NEW BUILDING, I OBSERVED GUARDRAIL SYSTEM AT EXP3&4 REMOVED TO MANEUVER EXCAVATOR. THIS EXPOSING WORKERS WITHIN AREA TO FALLING HAZARD 10FT+ CONTRARY TO BC3304.4. #39559172R | Nov 25, 2026 PENDING | $5,000 |
| Sep 15, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OF A PROPOSED 3-STORY NEW BUILDING IN EXCAVATION/FOUNDATION PHASE, UPON REQUEST, THE ENGINEER-STAMPED SITE SAFETY PLAN WAS NOT PROVIDED OR MADE AVAILABLE ON SITE. FAILURE TO MAINTAIN REQUI #39559174K | Nov 25, 2026 PENDING | $1,250 |
| Aug 17, 2026 | Construction CLASS - 2 OBSERVED PARTIALLY EXCAVATED SITE WITH SOE ON EXPO-1, EXPO-2, PART OF EXPO-3 & EXPO4. H-PILES INSTALLED ON SITE FOR SOE SOLDIER PILES. FILED SOE DWG SHOWS ROUND 9-5/8 PILES TO BE USED FOR SOE SOLDIER PILES. STO #39558068M | Oct 28, 2026 PENDING | $1,250 |
| Feb 16, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION ON PROPOSED DEMO INACTIVE ENCLOSED JOBSITE. DURING PERIMETER INSPECTION I OBSERVED INSTALLED JOBSITE FENCE IN PLACE WITH EXPIRED PERMIT#-(B00658254-I1-FN) DATED 01/10/2023 AND NOT RENEWED #39513215Y | Nov 4, 2024 IN VIOLATION | $1,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 15, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF A 3-STORY NEW BUILDING IN EXCAVATION/FOUNDATION EXCEEDING 6 FEET IN DEPTH WITHOUT A SAFE MEANS OF INGRESS AND EGRESS. THIS CONDITION IS NOT IN COMPLIANCE WITH BC 3304.7 ACCESS EXCAV | Open |
| Sep 15, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF A 3-STORY NEW BUILDING IN THE EXCAVATION/FOUNDATION PHASE, I OBSERVED AN EXCAVATOR OPERATING AT EXPOSURE #3 WHERE THE SIDES OF THE EXCAVATION LACKED PROPER SLOPING OR PROTECTION. TH | Open |
| Sep 15, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF A PROPOSED 3 STORY NEW BUILDING, I OBSERVED GUARDRAIL SYSTEM AT EXP3&4 REMOVED TO MANEUVER EXCAVATOR. THIS EXPOSING WORKERS WITHIN AREA TO FALLING HAZARD 10FT+ CONTRARY TO BC3304.4. | Open |
| Sep 15, 2026 | ECB | Construction: AT TIME OF INSPECTION OF A PROPOSED 3-STORY NEW BUILDING IN EXCAVATION/FOUNDATION PHASE, UPON REQUEST, THE ENGINEER-STAMPED SITE SAFETY PLAN WAS NOT PROVIDED OR MADE AVAILABLE ON SITE. FAILURE TO MAINTAIN REQUI | Open |
| Aug 17, 2026 | ECB | Construction: OBSERVED PARTIALLY EXCAVATED SITE WITH SOE ON EXPO-1, EXPO-2, PART OF EXPO-3 & EXPO4. H-PILES INSTALLED ON SITE FOR SOE SOLDIER PILES. FILED SOE DWG SHOWS ROUND 9-5/8 PILES TO BE USED FOR SOE SOLDIER PILES. STO | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 2:24 PM ET. BBL 3065920001.