Brooklyn · Block 2199 · Lot 22 · 11211

100 Lee Avenue

7 floors · 15 apartments · 46,771 sq ft · built 2025 · class D7 · owner of record: 100 Lee Development Llc

0open violations
$30,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 118 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 46,771 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 797 days
Next cycle year 2028

Open violations

ECB / OATH (7) · $30,000 owed
IssuedViolationHearingBalance
Dec 15, 2025Unknown CLASS - 1
B1M7-A MASON WORKER SUSTAINED A CUT ON PINKY ON HIS LEFT HAND WHILE PLACING BRICKS. JOB#B01117992. FAILED TO SUBMIT REPORT WITHIN 3 BUSINESS DAYS OF REQUIRED 16 ITEMS TO CODE 28-103.21 PER-28-103.21.1 VIA WEB
#39547975M
Oct 5, 2026
IN VIOLATION
$5,000
Sep 22, 2025Construction CLASS - 1
INSPECTION REVEAL THAT WORKERS WERE ON A RESTRICTION FOR NOT USING THE WORK / STORAGE ZONE AT EXPOSURE 1, BUT WORKERS CONTINUE TO IGNORE STOP WORK ORDER, CONCRETE PUMP AND DELIVERY OF CONCRETE MIXTURE TRUCK WER
#39545158N
Feb 16, 2027
$10,000
Sep 18, 2025Unknown CLASS - 2
BC 3307.4 ACTIVE SITE CONCRETE OPERATION IN PROGRESS OBSERVED INADEQUATE WORK AND STORAGE ZONE MISSING SECTION NOT COMPLETED ENCLOSED SEPARATING UNDERSIDE OF SIDEWALK DECK, INADEQUATE BARRIERS NOT FULLY ENCLOSI
#39545068J
Mar 1, 2027
$2,500
Sep 18, 2025Unknown CLASS - 2
ACTIVE SITE CONCRETE OPERATION IN PROGRESS WORKERS POURING OF 4TH FLOOR DECK OBSERVED NO OVER HEAD PROTECTION IN PLACE AT EXP#3 AS REQUIRED BY CODE AND ALSO SITE SAFETY PLAN FOR ADJACENT PROPERTY. STOP ALL WOR
#39545070Z
Mar 1, 2027
$5,000
Sep 18, 2025Unknown CLASS - 2
BC 3307.2.1 OBSTRUCTION OF SIDEWALK. ACTIVE SITE CONCRETE OPERATION IN PROGRESS OBSERVED SIDEWALK CLOSED OFF AND ALSO OUTRIGGERS FOR CONCRETE PUMP EXTENDED ON SIDEWALK. UPON REQUEST FOR DOT PERMIT FOR SIDEWALK
#39545067H
Mar 1, 2027
$2,500
Sep 18, 2025Unknown CLASS - 2
ACTIVE SITE CONCRETE OPERATION IN PROGRESS WORKERS POURING 4TH FLOOR DECK. OBSERVED MISSING WINDOW PROTECTION FOR THE ADJACENT PROPERTY AT EXP# 3. STOP ALL WORK EXP#3 AND 15FT BACK PROVIDE WINDOW PROTECTION.
#39545066X
Mar 1, 2027
$2,500
Sep 18, 2025Unknown CLASS - 2
BC 3303.9 EGRESS AT TIME OF INSPECTION OBSERVED ADJACENT EXISTING BUILDING MEANS OF EGRESS WAS AFFECTED FIRE ESCAPE WERE CLOSED OFF AND SEAL TIGHT WITH MESH. ALSO EGRESS PATH WERE CLOSED OFF WITH BARRIERS CREAT
#39545069L
Mar 1, 2027
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 7:39 AM ET. BBL 3021990022.