6 floors · 61 apartments · 54,888 sq ft · built 1964 · class D1 · owner of record: 100 E 92nd Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 54,888 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 411 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4594). Agency page | Dec 31, 2034 in 2968 days | Next due 2034 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 14, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39113726N AS OF 5/14/2026., FILE A CERTIFICATE #39188554M | Aug 19, 2026 ADMIT/IN-VIO | $0 |
| Feb 28, 2025 | Elevators CLASS - 2 MISALINGED CAB MIRROR. REPLACE WORN GIBS WHERE NEEDED. SECURE GIBS WHERE NEEDED. SEAL HOIST MACHINE LEAKS. REMOVE UNAUTHORIZED EQUIPMENT FROM MACHINE ROOM. SHORTEN GOVERNOR ROPE. #39139929Z | May 14, 2025 ADMIT/IN-VIO | $0 |
| May 7, 2024 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED FACADE IN STATE OF DISREPAIR, PARAPET WALLS AT EXP# 2,3 AND 4 SLIGHTLY LEANING INWARD. ALSO AT EXP#3 AND 4 DAMAGED BRICKS AT MULTIPLE LOCATIONS., MAINTAIN EXTERIOR BUILDING WALL #39113726N | Jan 21, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 12, 2026 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED.DEFECTIVE ALUMIN UM COPING AT THE PARAPET LEVEL ABOVE EXP1 AND EXP4.REMEDY:REMOVE ALL A LL LOSE AND UNSAFE MATERIALS INCLUDING DEFECTIVE ALUMINUM COPING ABOVE THE PARAPET WALL.PROVIDE ADEQUATE SAFETY MEASURES TO PROTECT THE PUBLI C.RETAIN A PROFE #FA1701AB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Active |
| Jun 24, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 4, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 7, 2026 |
| Aug 29, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BULKED DOOR AT EAST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORY, SECTION ''B'' | Oct 3, 2025 |
| Aug 29, 2025 | B | Apt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 3, 2025 |
| Aug 29, 2025 | B | Apt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 3, 2025 |
| Aug 29, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT COMPACTOR DOOR AT WEST WALL AT PUBLIC HALL, 6th STORY | Oct 3, 2025 |
| Jul 21, 2025 | B | § 27-2005 HMC: REFIT FIRE DOOR AT STAIRCASE A AT PUBLIC HALL | Aug 25, 2025 |
| Jun 10, 2020 | C | Apt 2J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 6, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Open |
| Sep 12, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED.DEFECTIVE ALUMIN UM COPING AT THE PARAPET LEVEL ABOVE EXP1 AND EXP4.REMEDY:REMOVE ALL A LL LOSE AND UNSAFE MATERIALS INCLUDING DEFECTIVE ALUMINUM COPING ABOVE THE PARAPET WALL.PROVIDE ADEQUATE SAFETY MEASURES TO PROTECT THE PUBLI C.RETAIN A PROFE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 2:36 AM ET. BBL 3045940041.