6 floors · 74 apartments · 72,743 sq ft · built 1925 · class C7 · owner of record: Seadyck Realty Co.,
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 72,743 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 415 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2237). Agency page | Dec 31, 2027 in 415 days | Next due 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-26 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 17, 2024 | Unknown CLASS - 2 I OBSERVED INTERIOR RENOVATION OF RESTAURANT "MAMA SUSHI", EXPOSED CONDUCTORS IN CEILING, ELECTRICAL RACEWAYS AND RECEPTACLE BOXES LAYING ON THE FLOOR . I ALSO OBSERVED USE OF ELECTRICAL METALLIC RACEWAYS FOR O #39111846Z | Jan 28, 2027 PENDING | $4,000 |
| Aug 24, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: UPON INSPECTION OBSERVED AT ROOF LEVEL THE MECHANICAL EXHAUST VENTILATION SYSTEM VIBRATING STRONGLY AND LOUDLY. THE EXHAUST VENT ALSO HAS A LOUD BANGING SO #39046506Y | Jul 28, 2022 IN VIOLATION | $0 |
| Aug 24, 2021 | Construction CLASS - 2 WORK WITHOUT A PERMIT: UPON INSPECTION OBSERVED AT REAR OF MIXED USE BUILDING A NEW CAST IRON PIPE. NEW PIPE IS COMING UP FROM THE EARTH APPROXIMATELY 3FT AND IS ATTACHED TO AND GOES ALONG RETAINING WALL. WORK #39046507X | Aug 3, 2023 IN VIOLATION | $0 |
| Aug 24, 2021 | Construction CLASS - 2 WORK WITHOUT A PERMIT: UPON INSPECTION OBSERVED AT REAR OF MIXED USE BUILDING THE PAVEMENT HAS BEEN EXCAVATED. A SECTION APPROXIMATELY 25FT LONG BY 4FT WIDE BY 2 FT DEEP HAS BEEN REMOVED AND COVERED WITH PLYWOO #39046509J | Aug 3, 2023 IN VIOLATION | $0 |
| Nov 20, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35296069L ISSUED ON 1/10/18AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICA #37012471P | Mar 28, 2019 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Feb 23, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00018 | DOB VIOLATION - ACTIVE |
| Nov 3, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00026 | DOB VIOLATION - ACTIVE |
| Aug 3, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00041 | DOB VIOLATION - ACTIVE |
| May 3, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00200 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #04236 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #04957 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #05213 | DOB VIOLATION - ACTIVE |
| Oct 4, 2008 | CONSTRUCTION #1202SP | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 23, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 3, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 3, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 3, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 13, 2026 | B | Apt 5K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WALL CABINET A NORTH WALL IN THE KITCHEN LOCATED AT APT 5K, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 17, 2026 |
| Mar 13, 2026 | B | Apt 5K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET DOORS AT UPPER CABINETS AT NORTH WALL IN THE KITCHEN LOCATED AT APT 5K, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 17, 2026 |
| Mar 13, 2026 | B | Apt 5K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE FORMICA COUNTER TOP AT LOWER BASE CABINET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 5K, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 17, 2026 |
| Mar 13, 2026 | B | Apt 5K · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 5K, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 17, 2026 |
| Mar 13, 2026 | B | Apt 5K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD AT BOTTOM OF BASE CABINET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 5K, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 17, 2026 |
| Mar 13, 2026 | B | Apt 5K · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 5K, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 17, 2026 |
| Apr 4, 2025 | B | Apt 1A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TILES FLOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 9, 2025 |
| Mar 17, 2025 | C | Apt 4F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 23, 2025 |
| Jan 21, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK, AND ASSEMBLY INSTALLED, AT FRONT ENTRANCE DOOR TO THE BUILDING. AT PUBLIC HALL, 1st STORY | Jan 27, 2025 |
| Jan 21, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE, AT UPPER, AND LOWER SASH, AT EAST WINDOW AT PUBLIC HALL, 1st STORY | Jan 27, 2025 |
| Jan 21, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE, AT UPPER, AND LOWER SASH, AT EAST WINDOW AT PUBLIC HALL, 2nd STORY | Jan 27, 2025 |
| Jan 21, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE, AT UPPER, AND LOWER SASH, AT EAST WINDOW AT PUBLIC HALL, 3rd STORY | Jan 27, 2025 |
| Jan 21, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE, AT UPPER, AND LOWER SASH, AT EAST WINDOW AT PUBLIC HALL, 4th STORY | Jan 27, 2025 |
| Jan 21, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE, AT UPPER, AND LOWER SASH, AT EAST WINDOW AT PUBLIC HALL, 5th STORY | Jan 27, 2025 |
| Jan 14, 2025 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS, AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Feb 18, 2025 |
| Jan 2, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST, 6th STORY, SECTION ''BLDG5'' | Feb 6, 2025 |
| Jan 2, 2025 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE KITCHEN LOCATED AT APT 5F, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''BLDG5'' | Feb 6, 2025 |
| Jan 2, 2025 | C | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, AND CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''BLDG5'' | Jan 8, 2025 |
| Jan 2, 2025 | C | Apt 5F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''BLDG5'' | Jan 8, 2025 |
| Jan 2, 2025 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 5F, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''BLDG5'' | Feb 6, 2025 |
| Sep 16, 2024 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 5F, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 21, 2024 |
| Sep 16, 2024 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT ROOF IN THE 1st ROOM FROM EAST LOCATED AT APT 5F, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 21, 2024 |
| Sep 16, 2024 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, SOUTH AND EAST WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 5F, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 21, 2024 |
| Sep 9, 2024 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING INSIDE THE CLOSET ON NO IN THE FOYER LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 14, 2024 |
| Sep 9, 2024 | A | Apt 5G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING INSIDE THE CLOSET ON NORTH IN THE FOYER LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 13, 2024 |
| Sep 9, 2024 | A | Apt 5G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL. IN THE 1st ROOM FROM EAST LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 13, 2024 |
| Sep 9, 2024 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 14, 2024 |
| Sep 9, 2024 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 14, 2024 |
| Sep 9, 2024 | A | Apt 5G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 13, 2024 |
| Jul 22, 2024 | B | Apt 1M · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| Aug 10, 2023 | A | Apt 2E · § 27-2005 HMC: REFIT LOWER SASH AT FIRE ESCAPE WINDOW IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 13, 2023 |
| Jun 13, 2023 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH COUNTER BALANCES AT 2ND STORY INTERMEDIATE LANDING, BETWEEN 2ND AND 3RD STORY AT PUBLIC HALL, 2nd STORY | Jul 18, 2023 |
| May 31, 2023 | C | Apt B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 6, 2023 |
| May 22, 2023 | C | Apt 2F · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES RANGE IN THE KITCHEN LOCATED AT APT 2F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 28, 2023 |
| Jul 23, 2021 | B | Apt D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''5'' | Aug 27, 2021 |
| Mar 4, 2020 | B | Apt B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 8, 2020 |
| Mar 4, 2020 | B | Apt 4J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BATHROOM PLASTER CEILING AT HEAT RISER 4 STY SOUTH APT 4J BUILDING 9. LOCATED AT APT 4J | Apr 8, 2020 |
| Oct 4, 2010 | C | Apt 2L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2L, 3rd STORY, 1st APARTMENT FROM N | Nov 13, 2010 |
| Oct 4, 2010 | C | Apt 2L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 13, 2010 |
| Jun 30, 2005 | C | Apt 3D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 3D, 3rd ST | Jul 26, 2005 |
| Jun 30, 2005 | C | Apt 3D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT | Jul 26, 2005 |
| Jun 30, 2005 | C | Apt 3D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3D, 3rd STORY, | Jul 26, 2005 |
| Nov 13, 2000 | C | Apt A · § 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR IS ON A DETERIORATED SUBSURFACE - USING EXCLUSIVE INTERIM CONTROLS. EAST WALL AT EAST IN THE BATHROOM LOCATED AT APT A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 14, 2000 |
| Sep 28, 2000 | C | Apt A · § 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS ON A DETERIORATED SUBSURFACE THAT IS UNSTABLE OR UNSOUND USING EXCLUSIVE INTERIM CONTROLS. CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT A, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH | Oct 29, 2000 |
| Nov 25, 1997 | C | Apt 1D · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WALLS CLOSET NEAR BATHROOM 1 STY NORTHEAST APT 1D ER1 97033801 , SECTION '' '' | Dec 15, 1997 |
| Nov 25, 1997 | C | Apt 1D · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING WEST ROOM 1 STY NORTHEAST APT 1D MARTINEZ 569 7200 ER1 97033801 , SECTION '' '' | Dec 15, 1997 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 6:19 PM ET. BBL 1022370008.