Manhattan · Block 602 · Lot 7501 · 10014

1 Morton Square

14 floors · 142 apartments · 282,969 sq ft · built 2002 · class RM · owner of record: Unavailable Owner

26open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 282,969 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $61,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 853 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1166 days
Next cycle year 2029
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 602). Agency page

Dec 31, 2032
in 2262 days
Next due 2032
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-12 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (6)
IssuedViolationStatus
Sep 6, 2019(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
#00116
DOB VIOLATION - ACTIVE
Jan 26, 2018(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#00113
DOB VIOLATION - ACTIVE
Jan 3, 2017(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#00100
DOB VIOLATION - ACTIVE
Jan 3, 2017(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#00101
DOB VIOLATION - ACTIVE
Jan 3, 2017(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#00102
DOB VIOLATION - ACTIVE
Mar 31, 2014PRIVATE RESIDENTIAL ELEVATOR
2012 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
#00303
DOB VIOLATION - ACTIVE
DOB NOW Safety (20)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 10, 2025Elevators FTC-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Aug 29, 2025Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Nov 25, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A compliance report by 12/31/2023
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Sep 6, 2019Elevators ACJ1
Active
Jan 26, 2018Elevators ACJ1
Active
Jan 3, 2017Elevators ACJ1
Active
Jan 3, 2017Elevators ACJ1
Active
Jan 3, 2017Elevators ACJ1
Active
Mar 31, 2014Elevators JVIOS
Active
Oct 1, 2012Elevators JVIOS
Active
Oct 1, 2012Elevators JVIOS
Active
Oct 1, 2012Elevators JVIOS
Active
Oct 1, 2012Elevators JVIOS
Active
Oct 1, 2012Elevators JVIOS
Active
Oct 1, 2012Elevators JVIOS
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 21, 2026, 9:25 AM ET. BBL 1006027501.

Look up another building