2 floors · 35,082 sq ft · built 1912 · class K2 · owner of record: 1-27 East Fordham Road Associates
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 35,082 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 180 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 180 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1155 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 13, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER VIO#081925PI207072T CONTROL#341448 DATED 08/12/25 NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN.REM:COMPLY WITH THE COMMISSIONER'S ORDER. #35719074H | Jan 30, 2026 DEFAULT | $12,500 |
| Aug 13, 2019 | Unknown CLASS - 2 UNAPPORVED/UNSAFE/UNSUITABEL ELECTRICAL EQUIPMENT APPARATUS MATERIALS DEVICES APPLIANCES OR WIRING IN USE OBSERVED IN TEH BASEMENT JUST AS YOU DESENT DOWN THE STAIRS THERE IS A DEFECTIVE EXIT/EMERGECNY IGHT FI #35445676J | Nov 8, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 12, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER 342156,052725PI20701SB DATED 5/27/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 6/27/25 & START BLDG REPAIRS UNDER PERMIT BY 7/27/25 & COMPLETED/SIGNED OFF BY 8/26/25 A CAP & EVIDENCE OF COMPLETED WORK WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER 34215 #PI20707ZT | DOB VIOLATION - ACTIVE |
| May 27, 2025 | CONSTRUCTION CORRECTION ACTION PLAN REQ'D. OBSVD @ EXP1 @(15E(ABOVE EASY PIKINS) BULGING/LOOSE MASONRY @ THE PARAPET LEVEL. @ CORNER 1/2 STUCCO APPEARS TO BE DELAMINATING. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVALTHE ENTIRE BLDG & TO SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV WITHIN 30 #PI20701SB | DOB VIOLATION - ACTIVE |
| Mar 20, 2007 | MARQUEE #0182 | DOB VIOLATION - ACTIVE |
| Feb 2, 2006 | MARQUEE #0160 | DOB VIOLATION - ACTIVE |
| Jul 26, 2001 | CONSTRUCTION #ZSTF03DP | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #14139 | DOB VIOLATION - ACTIVE |
| Jan 29, 1990 | CONSTRUCTION #7J2 | VIOLATION UNSERVED ECB-ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 2:30 AM ET. BBL 2031890001.