5 floors · 136,108 sq ft · built 2011 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6). Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-23 (Accepted). Agency page | Dec 31, 2026 in 61 days | 4 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 136,108 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 14, 2026 | Construction CLASS - 2 REISSUE: 35724642N-FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. LACK OR EMERGENCY LIGHTS FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS. NO EMERGENCY LIGHTS IN ROOM. REMEDY: COMPLY WITH CODE. #35734491Y | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 14, 2026 | Construction CLASS - 2 REISSUE: 35724639M-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. INTERIOR SMOKE DOORS 5TH FLOOR STAIR A, CAFE 4TH FL. STAIR B, 408,TO AUDITORIUM. 3RD FLOOR STAIR A, STAIR B. REMEDY: COMPLY WITH CODE. #35734492X | Aug 14, 2026 POP/IN-VIO | $0 |
| Apr 30, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT AT TIME OF INSPECTION OBSERVED PLUMBING CONSTRUCTION WORKERS INSTALLING PIPES IN THE CEILING.REM:OBTAIN ALL PERMITS. #35686090J | May 28, 2026 POP/IN-VIO | $0 |
| Sep 16, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:OBSERVED DURING THE TIME OF INSPECTION 2ND FLR GYM DOES #35724642N | Oct 9, 2025 POP/IN-VIO | $0 |
| Sep 16, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.NOTED:EXTERIOR CAFETERIA DOOR ON THE 5TH FLR DOES NOT SELF-CLOSE.EXTERIOR SECOND CAFETERIA DOOR ON THE 5TH FLR DOES NOT SELF-CLOSE WHEN TESTED.REM:REPAIR/REPLACE DOOR. #35724639M | Oct 9, 2025 POP/IN-VIO | $0 |
| Sep 16, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:INTERIOR SMOKE DOORS DO NOT SELF-CLOSE PROPERLY,5TH FLR-STAIR A,511A CAFETERIA 4TH FLR-STAIR B,408 AUDITORIUM.3RD FLR-STAIR A,STAIR B.2ND FLR-STAIR A, #35724638K | Oct 9, 2025 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Jul 14, 2026 | ECB | Construction: REISSUE: 35724642N-FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. LACK OR EMERGENCY LIGHTS FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS. NO EMERGENCY LIGHTS IN ROOM. REMEDY: COMPLY WITH CODE. | Open |
| Jul 14, 2026 | ECB | Construction: REISSUE: 35724639M-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. INTERIOR SMOKE DOORS 5TH FLOOR STAIR A, CAFE 4TH FL. STAIR B, 408,TO AUDITORIUM. 3RD FLOOR STAIR A, STAIR B. REMEDY: COMPLY WITH CODE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 2:52 PM ET. BBL 4000060008.